Tomorrow's Goals — 2026-04-30
Matt's Priorities:
1. iPad/iPhone Dashboard UI — Test and refine responsive layout
2. HBM (Hybrid Briefing Mode) — Document coordination via ambient chat
1. Dashboard on iPad/iPhone
Status: Ready for testing. Cards fixed, JSON rendering resolved, IMAP proxy live.
What to check:
- [ ] Login page renders correctly on iPad Safari
- [ ] All cards show HTML (not JSON) after auth
- [ ] Event Graph shows calendar events
- [ ] IMAP card shows "Connected" status
- [ ] Responsive layout in portrait + landscape
- [ ] Touch targets large enough for fingers
- [ ] Light mode looks good (iOS default)
Access: https://family.hoffdesk.com (via Cloudflare tunnel)
Known issue: iCloud app password is active, emails will start flowing to Event Graph.
If issues found: Route to Daedalus for CSS/frontend fixes.
2. HBM — Hybrid Briefing Mode
Status: Phase 8 spec exists (icarus-phase-8-silent-observer.md) but needs implementation planning.
What HBM means:
- Family coordinates via natural Telegram chat (no app switching)
- Icarus silently extracts coordination from messages
- Only speaks up when conflicts detected
- Zero-UI for Aundrea — she just chats naturally
Architecture ready:
- Tier 1: Tripwire (regex/keyword filter — <10ms)
- Tier 2: Heavy Lifter (8B model on Gaming PC — 1-3s)
- Telegram group: "Family Logistics"
- Icarus bot: Privacy Mode OFF (reads all messages)
Implementation needed:
- [ ] Telegram bot setup in group chat
- [ ] Tripwire module (Python/regex)
- [ ] Coordination state extraction pipeline
- [ ] Conflict detection logic
- [ ] "Speak up" vs "silent update" decision tree
- [ ] Event Graph integration for extracted items
Route to: Socrates (backend pipeline) + Daedalus (if UI needed for config)
Dispatch Ready
Both items can be queued for tomorrow morning:
- Dashboard testing — Matt does UAT, reports issues
- HBM planning — Needs Socrates scoping session
Suggested flow:
1. Matt tests dashboard on iPad → reports findings
2. If clean, dispatch Daedalus for any polish
3. Dispatch Socrates for HBM architecture session (Proof of Intent)
4. Schedule HBM build for next sprint
Prepared by Wadsworth 📋 | 2026-04-29 03:46 UTC