📄 2026-04-26.md 3,598 bytes Apr 26, 2026 📋 Raw

2026-04-26

Maintenance

  • Oil change completed

2026-04-26 — Icarus Phase 5 Real World Sprint

Session Duration: ~12 hours continuous
Collaborators: Matt (Director), Wadsworth 📋, Socrates 🧠, Daedalus 🎨
Status: Phase 5 Week 1 In Progress


🎯 Major Deliveries

Phase 5a: Data Abstraction (Socrates)

Component Status Location
hoffmann.yaml ✅ Complete icarus/config/families/hoffmann.yaml
family_loader.py ✅ Complete icarus/core/family_loader.py
Briefing generator refactor ✅ Complete Uses YAML, not hardcoded

Decision: Single-tenant modularity. Family context loaded from YAML, not hardcoded strings.

Phase 5b: Memory System Port (Socrates — In Progress)

Component Status Notes
Spec delivered icarus-phase-5b-memory-port.md (11,448 bytes)
router.py 🔄 In Progress Adapted from costco_route
memory/engine.py 🔄 In Progress ChromaDB learning
validation/sanity.py 🔄 In Progress Hallucination prevention
memory/replay.py 🔄 In Progress SQLite spooler integration

Constraint: Copy, Decouple, Sever. Zero imports from costco_route. Icarus is sovereign.

Phase 5c: System State View (Daedalus — Complete)

Component Status Location
Handoff doc SYSTEM-STATE-HANDOFF.md
Template system-state.html.j2
Styles system-state.css
API endpoint ⏳ Pending Socrates to wire /system/state

Features: Read-only dashboard, HTMX polling, confidence bars, recent decisions.


🔄 Costco Route Assessment

Analyzed: Router, memory engine, validation logic, recipe extraction
Decision: Option A — Direct port, not shared library
Rationale: Director veto on Premature Abstraction. Icarus must be sovereign.

Port strategy:
- router.py → family member routing (zones → members)
- item_memory.py → assignment learning (items → documents)
- pipeline.py validation → sanity checks


🚀 Current Pipeline State

Week 1 Day 1-2:  COMPLETE
- Socrates: YAML abstraction, family loader

Week 1 Day 3: 🔄 IN PROGRESS
- Socrates: Memory port, validation
- Daedalus: System State View ( template done,  API pending)

Week 1 Day 4:  PENDING
- Integration testing

Week 1 Day 5:  PENDING
- Matt begins UAT

📚 Documentation Updated

Document Purpose
icarus-phase-5-real-world-sprint.md Sprint plan, 3 components
icarus-phase-5b-memory-port.md Port spec (Option A)
SYSTEM-STATE-HANDOFF.md Daedalus → Socrates handoff
hoffmann.yaml Family config (names, grades, inference rules)

🎯 Success Criteria Tracking

Criterion Status
YAML drives family inference ✅ Complete
System State view shows rules + routing 🔄 75% (template done, API pending)
Memory learning loop 🔄 In Progress
Zero multi-tenant code ✅ Enforced (single-tenant modularity)
SQLite spooler integration 🔄 In Progress

📅 Next Actions

  1. Socrates completes memory port (router, engine, validation, replay)
  2. Socrates wires /system/state API endpoint for Daedalus template
  3. Wadsworth validates integration, zero cross-domain dependencies
  4. Matt begins UAT on Week 1 Day 5 (tomorrow or next session)

Session continues: Phase 5b implementation in progress.