# Config Change Order: Agent Model Fallback Chains **Date:** 2026-04-20 **Author:** Daedalus 🎨 **For:** Socrates 🧠 to apply **Approved by:** Matt ## Architecture Principle The Beelink runs **Ollama as a cloud proxy only** — no local inference. All fallback chains end with the Gaming PC (`ollama-remote/`) as the local lifeboat. ## Changes ### 1. Wadsworth (main agent) **Current:** ```json { "id": "main", "workspace": "~/.openclaw/workspace", "model": { "primary": "ollama/glm-5.1:cloud", "fallbacks": [ "ollama/kimi-k2.5:cloud", "ollama-remote/phi4:14b" ] } } ``` **No change needed — already correct.** ### 2. Daedalus **Current:** ```json { "id": "daedalus", "workspace": "~/.openclaw/workspace-daedalus", "model": { "primary": "ollama/glm-5.1:cloud", "fallbacks": [ "ollama/kimi-k2.5:cloud", "ollama-remote/phi4:14b" ] } } ``` **No change needed — already correct.** ### 3. Socrates — FIX DUPLICATE FALLBACK **Current (broken):** ```json { "id": "socrates", "workspace": "~/.openclaw/workspace-socrates", "model": { "primary": "ollama/kimi-k2.5:cloud", "fallbacks": [ "ollama/kimi-k2.5:cloud", "ollama-remote/phi4:14b" ] } } ``` **After:** ```json { "id": "socrates", "workspace": "~/.openclaw/workspace-socrates", "model": { "primary": "ollama/kimi-k2.5:cloud", "fallbacks": [ "ollama/glm-5.1:cloud", "ollama-remote/phi4:14b" ] } } ``` ## Summary Table | Agent | Primary | Fallback 1 | Fallback 2 (Gaming PC) | |-------|---------|------------|----------------------| | **Wadsworth** | `ollama/glm-5.1:cloud` | `ollama/kimi-k2.5:cloud` | `ollama-remote/phi4:14b` | | **Daedalus** | `ollama/glm-5.1:cloud` | `ollama/kimi-k2.5:cloud` | `ollama-remote/phi4:14b` | | **Socrates** | `ollama/kimi-k2.5:cloud` | `ollama/glm-5.1:cloud` ✅ | `ollama-remote/phi4:14b` | ## Active Memory Per Matt — **leave active-memory decisions to Socrates**. Not included in this change order. ## After Applying 1. Restart gateway: `openclaw gateway restart` 2. Verify all three agents respond on primary models 3. Monitor logs for any unexpected fallback events ## Notes - The `qwen3.5:4b`, `llama3.2:3b`, etc. shown in local `ollama list` are **not** valid fallback targets per architecture (Beelink = cloud proxy only) - All three agents share the same Gaming PC lifeboat (`phi4:14b`) as last resort